Wholesale Price China SV-8800 Silicone Sealant for Insulating Glass to Norway Factories

Wholesale Price China SV-8800 Silicone Sealant for Insulating Glass to Norway Factories
  • Wholesale Price China SV-8800 Silicone Sealant for Insulating Glass to Norway FactoriesWholesale Price China SV-8800 Silicone Sealant for Insulating Glass to Norway Factories
  • Wholesale Price China SV-8800 Silicone Sealant for Insulating Glass to Norway FactoriesWholesale Price China SV-8800 Silicone Sealant for Insulating Glass to Norway Factories
  • Wholesale Price China SV-8800 Silicone Sealant for Insulating Glass to Norway FactoriesWholesale Price China SV-8800 Silicone Sealant for Insulating Glass to Norway Factories

Short Description:

Description SV-8800 is two components, high modulus; neutral curing silicone sealant specifically developed for assembly of high performance insulated glass units as secondary sealing material.   Where to use It is a two-component silicone that offers variable work life with high bonding strength to maintain the integrity of insulating glass unit, suits both commercial and residential IGU.   Key Features 1. High Modulus 2. UV resistance 3. Low vapor and gas transmission 4. Primerless adhesion...


Product Detail

Attentions

Application

Product Tags

We insist on offering high quality production with good business concept, honest sales and the best and fast service. it will bring you not only the high quality product and huge profit, but the most significant is to occupy the endless market for Wholesale Price China SV-8800 Silicone Sealant for Insulating Glass to Norway Factories, We warmly welcome you to establish cooperation and create a bright future together with us


Description

SV-8800 is two components, high modulus; neutral curing silicone sealant specifically developed for assembly of high performance insulated glass units as secondary sealing material.

 

Where to use

It is a two-component silicone that offers variable work life with high bonding strength to maintain the integrity of insulating glass unit, suits both commercial and residential IGU.

 

Key Features

1. High Modulus

2. UV resistance

3. Low vapor and gas transmission

4. Primerless adhesion to coated glass

5. 100% compatible to SV-8890

 

Technical data sheet

Test standard Test project Unit value
Before curing——25℃,50%R.H.
GB13477 Specific gravity(After mixing)   1.33
GB13477 Operating time min 20-40
GB13477 surface drying time(25℃,50%R.H.) min 80-188
corrosivity     No
7 days after curing——25℃,50%R.H.
GB/T 531 Durometer Hardness Shore A 40
GB13477 The tensile modulus at 12.5% elongation Mpa 0.18
  The ultimate tensile strength Mpa 0.92
GB13477 Elongation limit (fracture) % 150

 

Certification

GB-24266-2009;

 

Color

Component A(Base) – White, Component B(Catalyst)- Black

 

Package

1. Component A(Base): (190L), Component B(Catalyst) (18.5L)

2. Component A(Base):24.5kg (18L), Component B(Catalyst): 1.9kg (1.8L)

 

Shelf life

12 months

 

Note

If you want the TDS or MSDS or other details, please contact with our sales person.

  • Previous:
  • Next:



  • https://www.homebuildingandrepairs.com/foundations/index.html on this link for more interesting information about building foundations and basements. I’m not about to suggest a concrete walkway will protect your building foundation or basement in every instance, but it could. Let’s face it, a 4 foot wide walkway is going to be better than a 3 foot walk and a six-foot wide walkway is going to be better than a 4 foot walkway or sidewalk around the building perimeter, but don’t do this if this isn’t going to be aesthetically pleasing. There are other ways you can reduce soil erosion around your building foundation, if it’s a problem or you think it’s going to be a problem in the future. An alternative would be to lay a thick plastic liner down on top of the soil, about 3 foot wide and then fill it with a layer about 1 to 2 inches thick of rock, gravel or wood bark. One more thing I would like to point out, using the process in this critical, plastic layer needs to slope away from the building foundation. If it slopes towards the building foundation and water drains back towards the building, instead of away from it, then you would be defeating the purpose of installing anything. You can also install site drainage, roof gutters and other drainage systems. Anyway, if you’re looking for more helpful information about your property, building or even remodeling, visit our websites today.



    Replacing a delaminated nose cap

    Related Products

    WhatsApp Online Chat !