Wholesale Discount Siway SV-602 Epoxy Structural Adhesive A/B for Atlanta Manufacturer

Wholesale Discount Siway SV-602 Epoxy Structural Adhesive A/B for Atlanta Manufacturer
  • Wholesale Discount Siway SV-602 Epoxy Structural Adhesive A/B for Atlanta ManufacturerWholesale Discount Siway SV-602 Epoxy Structural Adhesive A/B for Atlanta Manufacturer

Short Description:

Description SV-602 is a 2-part structural epoxy adhesive developed for such application as dry fixing cladding. It has strong adhesion to metals, woods, reinforced plastics stone, ceramic and masonry. It is the best choice for bonding parts which must withstand weather, moisture and temperature fluctuations. SV-602 will adhere with minimum surface preparation and has a low coefficient of expansion.   Key Features 1. Room temperature curing Epoxy adhesive 2. Fast cure at room temperature,...


Product Detail

Attentions

Application

Product Tags

We can always satisfy our respected customers with our good quality, good price and good service due to we are more professional and more hard-working and do it in cost-effective way for Wholesale Discount Siway SV-602 Epoxy Structural Adhesive A/B for Atlanta Manufacturer, We are glad that we are steadily growing with the active and long term support of our satisfied customers !


Description

SV-602 is a 2-part structural epoxy adhesive developed for such application as dry fixing cladding. It has strong adhesion to metals, woods, reinforced plastics stone, ceramic and masonry. It is the best choice for bonding parts which must withstand weather, moisture and temperature fluctuations. SV-602 will adhere with minimum surface preparation and has a low coefficient of expansion.

 

Key Features

1. Room temperature curing Epoxy adhesive

2. Fast cure at room temperature, <40 min for reaching a tack-free status under standard environment (STD: 23℃, 50% humidity)

3. Mix ratio of 1:1 by volume or by weight

4. Good mechanical property

5. Bonds a wide variety of building materials

6. Good waterproofing and chemical resistance

 

Basic Application

1, the external walls of stone material, ceramic and other hang bond;

2, concrete, ceramics, stone, wood and other prefabricated split, bonding and jointing;

3, concrete, stone and so on crack repair;

4, the structure of the localization, anchor, reinforcement and reinforcement.

 

Technical data sheet

The following data is for reference only and is not recommended for the specification

Shear strength Stainless steel-stainless steel/Standard conditions ≥18   JC887-2001
Pressure shear strength Stone-stone/ Standard conditions ≥12
Stone-stone/ The freeze-thaw cycle 50 times ≥10
Stone – stainless steel/ Standard conditions ≥12
Standard conditions:Temperature=23℃,relative humidity=50%,48 hours curing
attribute SV-602-A SV-602-B SV-602(After mixing)
Colour gray white grey
Density(g/cm³) 1.8 1.8 1.8
Viscosity(PaS) 200-400 150-250  
Effective operating time(23℃) N/A N/A 20min
           

 

Certification

JC 887-2001

 

Color

Part A-Grey Paste/Part B-White Paste

 

Package

9kg/9kg per unit and 15kg/15kg per unit

 

Shelf life

12 months

 

Note

If you want the TDS or MSDS or other details, please contact with our sales person.

  • Previous:
  • Next:



  • This video is being managed exclusively by Newsflare. To use this video for broadcast or in a commercial player, email: newsdesk@newsflare.com or call: +44 (0) 8432 895 191

    This is actually a great life hack: How to find where the leak is in an inflatable object. All you need is a wet rag and some soap spray. Spray the tube. Find the bubble, fund the hole. Enjoy! And like, share and subscribe :)



    Check out our blog for clickable links to the items below!
    Blog- https://www.heywandererblog.com/2017/06/diy-stock-tank-pool-everything-you-need.html
    Instagram- www.instagram.com/heywanderer
    E-mail- heywanderer@gmail.com

    Things you will need:
    - Stock tank (size of your choosing- ours is 8 ft.)
    - Above Ground Pool Pump
    - Weatherproof Silicone Sealant
    - Hole Saw with Arbor
    - Plunger Valves
    - Pool Outlet
    - 1-3 Rubber Washers (or Gaskets)
    - 1 Strainer Nut

    Other things you will need for maintenance:
    - Chlorine Tablets
    - Floating Pool Dispenser
    - Water Testing Kit

    Step 1- Find a nice level area to lay the stock tank on. If the area where you have chosen isn’t level, use sand or rocks to build up whatever side needs it. It is very important that your stock tank be level so there aren’t any unexpected leaks.
    Step 2- Cut holes in your stock tank. I’m not going to lie- this is a pain in the butt. We bought a hole saw with an arbor and it took two people to get through the metal. You will need two holes, one at the top and one at the bottom. In an above ground pool, these aren’t usually right on top of each other, but ours are. We haven’t ever seen this as a problem.
    Step 3- Start assembling the parts. In the pool pump package there is a packet with instructions, warnings and troubleshooting. This packet proved to be vital in the setup of the pool. I did end up getting 2 gaskets for the bottom section (the drain section), one for the inside of the pool and one for the outside. It only says you need one for the inside, but this was causing a drip for us. I also put thread seal tape around the connections that were closest to the pool. There are a lot of connections, and each one has a gasket, so you could probably get away without the tape. I didn’t put it on all the connections, the only ones that really seemed to matter were the ones that are connecting the hoses to the pool.
    Step 4- Apply silicone waterproof sealant around all crevices involving the input and output parts. I did this on the inside of the pool and the outside. And I applied it VERY HEAVILY and did two layers, allowing one to dry before the second was applied. Sealing these crevices is one of the most important parts. This is what is going to keep the water in the pool. Well all of these steps are leading up to keeping water in the pool, but if there is any chance that it’s going to be getting out, this is what will save you.
    Step 5- Test for leaks. Before I added water to the pool, I took a water bottle and poured a good amount of water on the input and output parts. You could also just use a water hose. I would make sure the hose wasn’t on full blast. You don’t want to accidentally penetrate the sealant.
    Step 6- Once you are sure there aren’t any leaks, fill the pool just above the bottom hole/output. Check again to see if any leaks have started. If there aren’t any, fill the rest of the pool up!
    Step 7- Turn the pump on. Make sure both plunger valves are open/unlocked. When you first do this water may not come out of the output, but there is a solution! Twist off the knob on top of the filter pump to let some air out. Some water may escape too and that’s okay, just be ready to screw it back on as soon as the water starts coming out.

    Related Products

    WhatsApp Online Chat !