Short Lead Time for SV-8890 Two-component Silicone Structural Glazing Sealant to Lahore Manufacturer

Short Lead Time for SV-8890 Two-component Silicone Structural Glazing Sealant to Lahore Manufacturer
  • Short Lead Time for SV-8890 Two-component Silicone Structural Glazing Sealant to Lahore ManufacturerShort Lead Time for SV-8890 Two-component Silicone Structural Glazing Sealant to Lahore Manufacturer

Short Description:

Description SV8890 is neutral curing, designed for glass, stone, marble, granite, aluminum curtain wall and glass daylighting roof and metal structural engineering structural adhesive seal designed silicone sealant structure, excellent bonding performance of structure and the weathering resistance, after artificial accelerated weathering test, various physical and chemical properties have no obvious change in the sealant. When using, SV8890 with dedicated two-component glue machine constructi...


Product Detail

Attentions

Application

Product Tags

Our pursuit and company goal is to "Always satisfy our customer requirements". We continue to develop and design superior quality products for both our old and new customers and achieve a win-win prospect for our clients as well as us for Short Lead Time for SV-8890 Two-component Silicone Structural Glazing Sealant to Lahore Manufacturer, Adhering to the business principle of mutual benefits, we have won good reputation among our customers because of our perfect services, quality products and competitive prices. We warmly welcome customers from home and abroad to cooperate with us for common success.


Description

SV8890 is neutral curing, designed for glass, stone, marble, granite, aluminum curtain wall and glass daylighting roof and metal structural engineering structural adhesive seal designed silicone sealant structure, excellent bonding performance of structure and the weathering resistance, after artificial accelerated weathering test, various physical and chemical properties have no obvious change in the sealant. When using, SV8890 with dedicated two-component glue machine construction, two kinds of components in accordance with the provisions, mixing ratio after curing form elastomer.

 

Key Features

1. None sag

2. Adjustable working time

3. Excellent adhesion to most building substrates

4. High bonding strength and modulus

5.12.5%movement capability

6. Silicone durability

 

Basic Application

1.Glass, stone, marble, granite, aluminum curtain wall and glass daylighting roof and metal structural engineering structural adhesive seal;

2.Insulating Glass of the second seal

3.Many other building and industrial applications

 

Technical data sheet

Test project Unit value
Flow, sagging or vertical flow mm 0
Operating time min 20
surface drying time(25℃,50%R.H.) min 40-60
Durometer Hardness Shore A 20-60
At 23 ℃ maximum tensile strength elongation % ≥100
Tensile strength(23℃) Mpa 0.9
Tensile strength(90℃) Mpa 0.68
Tensile strength(-30℃) Mpa 0.68
Tensile strength(flooding) Mpa 0.68
Tensile strength(flooding – ultraviolet) Mpa 0.68
Bond damage area % 5
Thermal aging(thermal weight loss) % ≤5
Thermal aging(crack)   No
 Thermal aging(efflorescence)   No

 

Certification

GB 16776

 

Color

Component A(Base) – White, Component B(Catalyst)- Black

 

Package

1. Component A(Base): (190L), Component B(Catalyst) (18.5L)

2. Component A(Base):24.5kg (18L), Component B(Catalyst): 1.9kg (1.8L)

 

Shelf life

12 months

 

Note

If you want the TDS or MSDS or other details, please contact with our sales person.

  • Previous:
  • Next:



  • Describes how to use Mohawk Lacquer for Brass.

    For more information, or to order:

    https://amzn.to/1N8ynwG

    Will keep your brass and brass plated metal surfaces brillant. Keeps metal bright and new looking. Prevents tarnishing, protects. It is a water clear, non-yellowing and durable coating. Adhesion is excellent to metal surfaces.

    Directions

    Note:

    As the name suggests, this is a lacquer for metals such as brass. The lacquer contains an anti-tarnish additive to keep metals bright, clean and looking new longer.

    Step 1
    Make sure the parts to be sprayed are clean.

    Step 2
    Shake the can vigorously for at least one minute after the mixing ball rattles to ensure that the lacquer is mixed properly and to prevent clogging.

    Step 3
    To avoid overspray, if the part to be sprayed is attached to a piece of furniture such as brass drawer handles or hinges, remove the part before spraying.

    Step 4
    To spray, point the opening of the spray button toward the object, holding the can 12 to 14 inches away from surface. Then press the spray button firmly. Use steady even strokes while spraying. Several thin coats will result in a better finish than one heavy coat.

    Step 5
    Allow the coating to become tacky between coats.

    Step 6
    Generally 3 light coats are plenty for coating a metal part.

    Step 7
    When the can is empty, discard the can in a trash pick-up. DO NOT place it in a home compactor and do not burn it.



    Crackbond EJ for expansion joint sealant. Non-Sag formulation for vertical and horizontal applications. Contact Adhesives Technology for details. (www.atcepoxy.com)

    Related Products

    WhatsApp Online Chat !