PriceList for SV-995 Neutral Silicone Sealant to Morocco Factory

PriceList for SV-995 Neutral Silicone Sealant to Morocco Factory
  • PriceList for SV-995 Neutral Silicone Sealant to Morocco FactoryPriceList for SV-995 Neutral Silicone Sealant to Morocco Factory
  • PriceList for SV-995 Neutral Silicone Sealant to Morocco FactoryPriceList for SV-995 Neutral Silicone Sealant to Morocco Factory
  • PriceList for SV-995 Neutral Silicone Sealant to Morocco FactoryPriceList for SV-995 Neutral Silicone Sealant to Morocco Factory

Short Description:

Description SV – 995 neutral silicone sealant structure is a kind of one-component, construction curtain wall structure of room temperature curing glue, can be used in all kinds of curtain wall joints and waterproof seal, also can be used for all kinds of aluminum alloy, glass doors and Windows seal assembly   Where  to use 1.Curtain wall joints and waterproof seal 2.Aluminum alloy, glass doors and Windows seal assembly   Key Features 1. 100% silicone 2. Easy to use 3. Waterproofing and...


Product Detail

Attentions

Application

Product Tags

We always continually provide you with the most conscientious customer service, and the widest variety of designs and styles with finest materials. These efforts include the availability of customized designs with speed and dispatch for PriceList for SV-995 Neutral Silicone Sealant to Morocco Factory, We welcome customers, business associations and friends from all parts of the world to contact us and seek cooperation for mutual benefits.


Description

SV – 995 neutral silicone sealant structure is a kind of one-component, construction curtain wall structure of room temperature curing glue, can be used in all kinds of curtain wall joints and waterproof seal, also can be used for all kinds of aluminum alloy, glass doors and Windows seal assembly

 

Where  to use

1.Curtain wall joints and waterproof seal

2.Aluminum alloy, glass doors and Windows seal assembly

 

Key Features

1. 100% silicone

2. Easy to use

3. Waterproofing and weatherproofing

4. Fast curing speed, high strength

5. 12.5% movement capability

 

Technical data sheet

Test standard Test project Unit value
Before curing——25℃,50%R.H.
GB13477 Flow, sagging or vertical flow mm 0
GB13477 surface drying time(25℃,50%R.H.) min 30

GB13477

Operating time min 20
  Curing time(25℃,50%R.H.) Day 7-14
Sealant curing speed and operating time will have different with different temperatures and temperature, high temperature and high humidity can make sealant curing speed faster, rather low temperature and low humidity are slower.21 days after curing——25℃,50%R.H.
GB13477 Durometer Hardness Shore A 40
GB13477 The ultimate tensile strength Mpa 0.8
GB13477 Movement capability % 12.5

 

Color

Black,White,Gray

 

Package

300ml in cartridge * 24 per box, 590ml in sausage *20 per box

 

Shelf life

12 months

 

Note

If you want the TDS or MSDS or other details, please contact with our sales person.

  • Previous:
  • Next:



  • Watch the full episode: https://www.youtube.com/watch?v=RVCfwHxIblA

    This Old House general contractor Tom Silva helps a homeowner install a rain gutter, downspout, and rain barrel. (See below for a shopping list, tools, and steps.)

    Click here to SUBSCRIBE to the official This Old House YouTube channel: https://www.youtube.com/subscription_center?add_user=thisoldhouse

    Shopping List for Installing a Rain Gutter:
    - Aluminum gutter
    - Aluminum downspout
    - Aluminum elbows, end caps, mounting straps, and downspout outlet
    - Gutter hanging brackets, for securing the gutter to the house
    - Sheet metal screws, used to fasten together the gutter and downspout parts
    - Gutter sealant, for creating waterproof connections between gutter parts
    - Two 2-inch-thick concrete pavers, used to create a solid base for the rain barrel
    - Rain barrel and diverter, used to collect rainwater

    Tools List for Installing a Rain Gutter:
    - Chalk line
    - Tape measure
    - Drill/driver
    - Level
    - Caulk gun
    - Crimping tool
    - Hacksaw and tin snips
    - Hammer and cold chisel (or hole saw), used to cut a hole in the gutter
    - Ladder

    Steps for Installing a Rain Gutter:
    1. Snap a chalk line across the fascia, creating the proper pitch toward the downspout end.
    2. Measure the fascia to determine the length of the gutter.
    3. Apply gutter sealant to an end cap, then press the cap onto one end of the gutter.
    4. Secure the end cap to the gutter with a crimping tool.
    5. Use a hacksaw and tin snips to cut the gutter to length.
    6. Use a hammer and a cold chisel (or a hole saw) to cut a round hole in the gutter for a downspout outlet.
    7. Apply gutter sealant to the flange of the downspout outlet, then screw the outlet to the hole in the gutter.
    8. Temporarily screw the gutter to the fascia, positioning it about 2 inches below the chalk line.
    9. Install hanging brackets onto the gutter, positioning one in front of each rafter.
    10. Raise the gutter to the chalk line and fasten each hanging bracket by screwing through the fascia and into the rafter tail.
    11. Set two 2-inch-thick concrete pavers on the ground directly below the downspout outlet.
    12. Set a rain barrel on top of the concrete pavers.
    13. Use a hacksaw to cut and assemble the downspout and elbows.
    14. Screw the upper end of the downspout to the downspout outlet protruding from the gutter.
    15. Fasten the downspout to the house with mounting straps.
    16. Install a diverter in the downspout, positioning it even with the top of the rain barrel.
    17. Attach a short length of downspout to the underside of the diverter.
    18. Connect the diverter’s flexible hose to the port on the side of the rain barrel.

    Follow This Old House and Ask This Old House:
    Facebook: https://www.facebook.com/ThisOldHouse
    Twitter: https://twitter.com/thisoldhouse

    https://twitter.com/asktoh

    Pinterest: https://www.pinterest.com/thisoldhouse/
    G+: https://plus.google.com/+thisoldhouse/posts
    Instagram: https://instagram.com/thisoldhouse
    Tumblr: https://thisoldhouse.tumblr.com/



    In order to create rubber mold, we use silver master mold as a main form. The make of rubber is Castaldo. By placing the actual master mold in the raw rubber and covering it with layers of rubber, we place it in a vulcanization machine. We heat the rubber at 375 degrees for 30 minutes.
    www.Chicjewelry.com features the finest high quality cubic ziroconia stones set in solid Platinum , gold, 14k white gold, rose gold designer settings. Visit www.CHICJEWELRY.COM and see our entire collection of top quality cubic zirconia stones set in same settings as natural diamonds ,sapphire and other precious stones. Buy directly from the maker and save!
    MADE IN USA

    Related Products

    WhatsApp Online Chat !