Factory supplied SV-8800 Silicone Sealant for Insulating Glass Supply to Botswana

Factory supplied SV-8800 Silicone Sealant for Insulating Glass Supply to Botswana
  • Factory supplied SV-8800 Silicone Sealant for Insulating Glass Supply to BotswanaFactory supplied SV-8800 Silicone Sealant for Insulating Glass Supply to Botswana
  • Factory supplied SV-8800 Silicone Sealant for Insulating Glass Supply to BotswanaFactory supplied SV-8800 Silicone Sealant for Insulating Glass Supply to Botswana
  • Factory supplied SV-8800 Silicone Sealant for Insulating Glass Supply to BotswanaFactory supplied SV-8800 Silicone Sealant for Insulating Glass Supply to Botswana

Short Description:

Description SV-8800 is two components, high modulus; neutral curing silicone sealant specifically developed for assembly of high performance insulated glass units as secondary sealing material.   Where to use It is a two-component silicone that offers variable work life with high bonding strength to maintain the integrity of insulating glass unit, suits both commercial and residential IGU.   Key Features 1. High Modulus 2. UV resistance 3. Low vapor and gas transmission 4. Primerless adhesion...


Product Detail

Attentions

Application

Product Tags

Our team through professional training. Skilled professional knowledge, strong sense of service, to meet the service needs of customers for Factory supplied SV-8800 Silicone Sealant for Insulating Glass Supply to Botswana, With superb service and quality, and an enterprise of foreign trade featuring validity and competitiveness, that will be trusted and welcomed by its clients and creates happiness to its employees.


Description

SV-8800 is two components, high modulus; neutral curing silicone sealant specifically developed for assembly of high performance insulated glass units as secondary sealing material.

 

Where to use

It is a two-component silicone that offers variable work life with high bonding strength to maintain the integrity of insulating glass unit, suits both commercial and residential IGU.

 

Key Features

1. High Modulus

2. UV resistance

3. Low vapor and gas transmission

4. Primerless adhesion to coated glass

5. 100% compatible to SV-8890

 

Technical data sheet

Test standard Test project Unit value
Before curing——25℃,50%R.H.
GB13477 Specific gravity(After mixing)   1.33
GB13477 Operating time min 20-40
GB13477 surface drying time(25℃,50%R.H.) min 80-188
corrosivity     No
7 days after curing——25℃,50%R.H.
GB/T 531 Durometer Hardness Shore A 40
GB13477 The tensile modulus at 12.5% elongation Mpa 0.18
  The ultimate tensile strength Mpa 0.92
GB13477 Elongation limit (fracture) % 150

 

Certification

GB-24266-2009;

 

Color

Component A(Base) – White, Component B(Catalyst)- Black

 

Package

1. Component A(Base): (190L), Component B(Catalyst) (18.5L)

2. Component A(Base):24.5kg (18L), Component B(Catalyst): 1.9kg (1.8L)

 

Shelf life

12 months

 

Note

If you want the TDS or MSDS or other details, please contact with our sales person.

  • Previous:
  • Next:



  • How to waterproof a Shower https://www.youtube.com/watch?v=fAXB_Yx7DUE
    How to install Mud in a shower floor https://www.youtube.com/watch?v=jIxiRk1KPzk
    Part 6 Corner seat and shower floor https://www.youtube.com/watch?v=kFftfgWqZJ0
    Part 7 Installing the tile https://www.youtube.com/watch?v=1q7bIacGNhM
    Part 8 Cutting in and Making a Recessed Niche https://www.youtube.com/watch?v=hTGB5Nn7LRE
    Part 9 installing the bathroom floor https://www.youtube.com/watch?v=-zLXk-rPd7w
    Part 10 Grouting and caulking the tile https://www.youtube.com/watch?v=NAGOxC9t3WE
    Part 1 Prepping walls, three piece drain explained https://www.youtube.com/watch?v=F8Gw6XFy3NI
    Part 2 Installing the pre slope https://www.youtube.com/watch?v=QNsboWBwT1E
    Part 3 Installing the Pan Liner https://www.youtube.com/watch?v=RBIff-SkOCk
    Part 4 Installing the Backer Board https://www.youtube.com/watch?v=Xue7liOgZoU
    A pre pitch or pre slope under a shower pan liner is an essential part of a successful tile shower installation. A pre slope is the base under the shower pan liner which is pitched so that the any water that manages to get into the shower base can be directed to the weep holes in the three piece drain and out of the liner. If a pre slope is not installed under the liner then any water that filters into the base of the shower will remain there. To install a pre slope on a concrete base first spread a thin layer of thinset with a notched trowel, while it is still fresh, the deck mud is then shaped on top of the thinset so that there is a slope of ¼” per foot sloping towards the drain. The part of the base furthest away from the drain will be higher than the drain, so as to create a positive pitch towards the drain. How to install a vinyl shower liner. When installing a vinyl liner for the pan of a shower floor, it is imperative that any penetrations to secure the liner be above the level of the shower curb. Also the folds at the corners of the shower should always be done without cutting the liner lower than the shower curb. I do not install dam corners on the curb, because I apply a liquid waterproofing membrane on the surface of the entire shower stall, or at the very least the curb will be thoroughly waterproofed to avoid leeks in this critical area if this step is to be omitted, the dam corners should be used. The silicone bead at the drain where the liner is clamped to the 3 piece drain should always be applied, do not skip this step. How to install mud in a shower pan for a tile shower stall. When installing a tile shower, whether it be ceramic, marble travertine or any other tile product, a mud base will be required. Mud also known as deck mud, is a mixture of sand and Portland cement mixed to a ratio that will create a solid foundation for the tile which will be installed on it. The deck mud is mixed with water to a dump consistence which will allow the deck mud to hold its shape when pressed into a ball. The mud must be pitcher towards the drain so that a slope of at least ¼” per foot is achieved. The ratio of sand and Portland cement is usually 4:1 or 5:1. I usually use “Quikrete” sand topping mix, which as far as I know, has a ratio which is a little richer than needed, but is suitable for a shower pan. The method I employ to install my mud in shower pan, is to create a level and flat perimeter around the base of the shower walls which is at the correct height in relation to the drain, and then fill the middle part of the shower pan screeding down to the drain with the proper pitch. The mud is shaped with a wooden trowel, steel trowel, level and other pieces of straight wood lengths cut to the required lengths. In this video I demonstrate the technique I use to install a shower mud pan base. There are other methods that can be used, but this is the way I have installed hundreds of shower bases.
    I hope anyone that watches this finds it helpful.
    All tile installed by Sal DiBlasi, Elite-tile Company, in the Boston North Shore area
    Youtube Channel https://www.youtube.com/user/saldibs?feature=watch
    Facebook https://www.facebook.com/pages/Elite-Tile-Company/56681633342
    Website https://www.elitetileco.com/

    Related Products

    WhatsApp Online Chat !