8 Years Manufacturer Siway SV-602 Epoxy Structural Adhesive A/B to Afghanistan Factory
Short Description:
Description SV-602 is a 2-part structural epoxy adhesive developed for such application as dry fixing cladding. It has strong adhesion to metals, woods, reinforced plastics stone, ceramic and masonry. It is the best choice for bonding parts which must withstand weather, moisture and temperature fluctuations. SV-602 will adhere with minimum surface preparation and has a low coefficient of expansion. Key Features 1. Room temperature curing Epoxy adhesive 2. Fast cure at room temperature,...
owing to good service, a variety of high quality products, competitive prices and efficient delivery, we enjoy a good reputation among our customers. We are an energetic company with wide market for 8 Years Manufacturer Siway SV-602 Epoxy Structural Adhesive A/B to Afghanistan Factory, We believe that a passionate, innovative and well-trained team will be able to establish good and mutually beneficial business relationships with you soon. Please feel free to contact us for more details.
Description
SV-602 is a 2-part structural epoxy adhesive developed for such application as dry fixing cladding. It has strong adhesion to metals, woods, reinforced plastics stone, ceramic and masonry. It is the best choice for bonding parts which must withstand weather, moisture and temperature fluctuations. SV-602 will adhere with minimum surface preparation and has a low coefficient of expansion.
Key Features
1. Room temperature curing Epoxy adhesive
2. Fast cure at room temperature, <40 min for reaching a tack-free status under standard environment (STD: 23℃, 50% humidity)
3. Mix ratio of 1:1 by volume or by weight
4. Good mechanical property
5. Bonds a wide variety of building materials
6. Good waterproofing and chemical resistance
Basic Application
1, the external walls of stone material, ceramic and other hang bond;
2, concrete, ceramics, stone, wood and other prefabricated split, bonding and jointing;
3, concrete, stone and so on crack repair;
4, the structure of the localization, anchor, reinforcement and reinforcement.
Technical data sheet
The following data is for reference only and is not recommended for the specification
Shear strength | Stainless steel-stainless steel/Standard conditions | ≥18 | JC887-2001 | ||
Pressure shear strength | Stone-stone/ Standard conditions | ≥12 | |||
Stone-stone/ The freeze-thaw cycle 50 times | ≥10 | ||||
Stone – stainless steel/ Standard conditions | ≥12 | ||||
Standard conditions:Temperature=23℃,relative humidity=50%,48 hours curing | |||||
attribute | SV-602-A | SV-602-B | SV-602(After mixing) | ||
Colour | gray | white | grey | ||
Density(g/cm³) | 1.8 | 1.8 | 1.8 | ||
Viscosity(PaS) | 200-400 | 150-250 | |||
Effective operating time(23℃) | N/A | N/A | 20min | ||
Certification
JC 887-2001
Color
Part A-Grey Paste/Part B-White Paste
Package
9kg/9kg per unit and 15kg/15kg per unit
Shelf life
12 months
Note
If you want the TDS or MSDS or other details, please contact with our sales person.
ΠΡΩΤΟΠΟΡΙΑΚΕΣ ΥΨΗΛΗΣ ΤΕΧΝΟΛΟΓΙΑΣ MS, ΚΟΛΛΕΣ & ΣΤΕΓΑΝΟΠΟΙΗΤΙΚΑ ΜΕ ΑΜΕΣΗ ΑΡΧΙΚΗ ΣΥΓΚΡΑΤΗΣΗ
INNOVATIVE HIGH-TECH MS, ADHESIVES & SEALANTS
This is how we did a CRACK INJECTION job to repair water leaks in CONCRETE for an underground garage.
https://www.buildingservicesaustralia….
We do polyurethane crack injection and remedial repairs to concrete. This particular job is just a small domestic job, garage actually. There is a leaking terrace from above and it has been leaking for some time apparently. The client has asked us to come so we can do about repairing it. We’ve done that. We’ve approached it from underneath because I don’t want to pull out the blue stamp paving from above.
https://www.buildingservicesaustralia….
THE PROCEDURE
So we’ve drilled into the cracks below and the wall.
We’ve inserted injector pins.
Then we, under high pressure injected a polyurethane water reactive sealing. This sealing adds with the water that is already in the joint, reacts and blooms to about ten times its size. You can see the blooming there, on the yellow color that’s coming out of the actual joint, dragging the salts with it, which is the white salts, the kali chlorides, which is coming out of it and leaching out, which is good. So it’s a good reaction. This is on the wall.
The pins have been driven to the wall, the yellow is blooming out and sealing up the joint as its blooming, doing a terrific job there.
We usually leave that to see how effective it is. There are usually a couple leaks afterwards, after a couple of weeks.
This is a shot here, we have returned.
Procedure After We Returned After a Couple of Weeks
There are still a couple of drips, so we:
Re-injected and put a couple more pins in there, put some more material in there and solve the problem completely.
Afterwards we cut all the pins off.
Seal the ports off with polyurethane sealing and
Give it a quick coat of cement screen, ready for painting.
That’s it for now, we’ve finished the job, everybody’s happy and look, just want to say, thank you for listening and looking at the video.
If you’d like to contact us, you can get us on
https://www.buildingservicesaustralia….
PHONE: 03 9897 4865
https://www.youtube.com/watch?v=GcSeX…