15 Years Factory wholesale SV-666 Neutral silicone sealant to Dubai Importers

15 Years Factory wholesale SV-666 Neutral silicone sealant to Dubai Importers
  • 15 Years Factory wholesale SV-666 Neutral silicone sealant to Dubai Importers15 Years Factory wholesale SV-666 Neutral silicone sealant to Dubai Importers
  • 15 Years Factory wholesale SV-666 Neutral silicone sealant to Dubai Importers15 Years Factory wholesale SV-666 Neutral silicone sealant to Dubai Importers
  • 15 Years Factory wholesale SV-666 Neutral silicone sealant to Dubai Importers15 Years Factory wholesale SV-666 Neutral silicone sealant to Dubai Importers

Short Description:

Description SV-666 neutral silicone sealant is a neutral curing glue single component, the modulus of the. It is specially designed for windows and doors caulking sealing general plastic doors and windows. It has good adhesion to glass and aluminum alloy, and has no corrosion.   Where  to use It is fit for multiple purpose sealing and bonding applications to form a silicone rubber adhering to adjacent substrates e.g. glass, ceramic, tile, wood and metal.   Key Features 1. 100% silicone 2. Eas...


Product Detail

Attentions

Application

Product Tags

"Control the quality by the details, show the strength by quality". Our company has strived to establish a highly efficient and stable staff team and explored an effective quality control process for 15 Years Factory wholesale SV-666 Neutral silicone sealant to Dubai Importers, We are looking forward to establishing long-term business relationships with you. Your comments and suggestions are highly appreciated.


Description

SV-666 neutral silicone sealant is a neutral curing glue single component, the modulus of the. It is specially designed for windows and doors caulking sealing general plastic doors and windows. It has good adhesion to glass and aluminum alloy, and has no corrosion.

 

Where  to use

It is fit for multiple purpose sealing and bonding applications to form a silicone rubber adhering to adjacent substrates e.g. glass, ceramic, tile, wood and metal.

 

Key Features

1. 100% silicone

2. Easy to use

3. Waterproofing and weatherproofing

4. Primerless adhesion to most building materials

5. 12.5% movement capability

 

Technical data sheet

Test standard Test project Unit value
Before curing——25℃,50%R.H.
GB13477 Flow, sagging or vertical flow mm 0
GB13477 surface drying time(25℃,50%R.H.) min 30

GB13477

Operating time min 20
  Curing time(25℃,50%R.H.) Day 7-14
Sealant curing speed and operating time will have different with different temperatures and temperature, high temperature and high humidity can make sealant curing speed faster, rather low temperature and low humidity are slower.21 days after curing——25℃,50%R.H.
GB13477 Durometer Hardness Shore A 28
GB13477 The ultimate tensile strength Mpa 0.7
  Temperature stability -50~+150
GB13477 Movement capability % 12.5

 

Certification

JC/T881-2001 12.5E;GB/T14683-2003 12.5E

 

Color

Black,White,Gray

 

Package

300ml in cartridge * 24 per box, 590ml in sausage *20 per box

 

Shelf life

12 months

 

Note

If you want the TDS or MSDS or other details, please contact with our sales person.

  • Previous:
  • Next:



  • Loctite® Superflex® Sealant is the fastest setting sealant becoming water resistant in just 2 hours.

    To learn more about Loctite Superflex Sealant, visit: https://www.henkelna.com/industrial/loctite-superflex-speedseal-13416.htm



    You should check the valves at 500 – 600 miles, then every 6,000 miles after that.

    Tools you’ll need:
    10 mm socket
    12 mm socket
    Medium ratchet with short AND long extension
    Big flat screwdriver or quarter
    19 mm socket
    Large ratchet
    Flat feeler gauge
    Torque wrench (one that works for low torques)
    16 mm wrench (optional)

    Need a Clymer manual? Check out https://www.clymer.com/ or https://www.youtube.com/user/ClymerManuals

    Body work removal and installation: https://www.youtube.com/watch?v=Kki7S2RZBGQ

    Remove the fan. The fan plug is mounted in a bracket on the frame – trace the wires, it’s easier than explaining. There are three 10 mm bolts. Two on the left and one near the center of the bike (right side of the fan) buried behind the radiator hose. The hose is pliable, push it out of your way. Use an extension. Unplugging the fan switch wire may also prove useful.

    Marknet Valve Check / Adjustment Procedures: https://www.klr650.marknet.us/valves.html
    I guess I lied. There is a link for the Clymers, but you still have to buy it: https://www.clymer.com/Book.aspx?bid=914&title=Kawasaki+KLR650%2c+1987-2006

    Unplug the spark plug wire (leave the spark plug alone! What did it ever do to you?) and the temperature sending wire (right next to the spark plug). Remove the ignition coil. It has two wires going into the back, unplug them, then remove the 10 mm bolts holing it in place.

    Remove the upper engine mount (I said I wasn’t going to to. *SPOILER ALERT* I tried to get the cover off for maybe 5 minutes to no avail. Then I gave in and took of the mount, the cover came out in about 10 seconds. Just do it). They are all 12 mm heads. Use the 16 mm wrench (not socket, like I said in the video… whoops.) to hold the plate “nut” from getting friendly with the engine.

    Snip the wire ties. Get rid of the gas tank rubber doodads. Clean as much of the bike above the valve area as you can.

    Take off the wire harness harness (two 10 mm bolts).

    Remove the valve cover bolts, all four are 12 mm. The two on the right are straight forward. The back left takes some wire wiggling, and the front left takes a lot of wire wiggling. Store the bolts in a safe place in such a way that you know where they go when you need to put them back in. Mind their gaskets.

    Valve stat sheet: https://www.klr650.marknet.us/valvclear.zip

    Remove the valve cover from the left side of the bike. Be careful: the surfaces are precision machined, screw up and the chance of leaks goes up. BE GENTLE! Gentle like it’s your girlfriend / wife / whathaveyou.

    Remove the two round plug on the left side of the engine. Use a big flat head screwdriver or a quarter. Use the 19 mm socket and large ratchet driver on the big hole and turn counterclockwise (the direction the wheels normally turn). There are three marks; you’re aiming for the third. It’s a straight tick mark with a T on right behind it. Watch the cam lobes. You’re at the “right” TDC (top dead center) when the tick mark by the T lines up with the lack of threads where the small cap goes AND the cam lobes all point away from each other. If you overshoot, take a breath, and spin the crank around TWICE. Watch the lobes if you’re wondering “why twice?”

    Use a flat feeler gauge and check your valve shim clearances. Watch the video for the explanation.

    Valve Shim Replacement: https://www.youtube.com/watch?v=R2d-V4udwaA

    Use RTV Silicone Sealant and make a thin coat on both sides of the gasket. Put the gasket in place. Put the valve cover back in place from the left side of the bike. Again, BE GENTLE. You’ve made it this far, don’t fubar your precision machined surfaces now.

    Replace the four cover bolts. Short on the left, long on the right. Tighten them evenly and carefully working your way up to 6 ft * lbs (that would be 71 INCH pounds).

    Put the ignition coil back on, plug in the two wires on the back of it, plug in the temperature sending wire and put the spark plug cap back on the spark plug.

    Put the fan back on (three bolts, 10 mm), plug it back in, put the plug back in its clip on the frame, plug the fan switch back in (bottom of the radiator).

    Replace the wire ties that you snipped.

    Replace the upper engine mount. All three bolts get torqued to 18 ft * lbs.

    Replace the Body Work (link is up top).

    Please rate and leave comments!

    For a wealth of KLR 650 information, please visit KLR650.NET – Your Kawasaki KLR650 Resource!
    If you decide to join, please use my referral link: https://www.klr650.net/forums/index.php?referrerid=17746

    Related Products

    WhatsApp Online Chat !