13 Years Factory SV-999 Structural Glazing Silicone Sealant to California Manufacturers

13 Years Factory SV-999 Structural Glazing Silicone Sealant to California Manufacturers
  • 13 Years Factory SV-999 Structural Glazing Silicone Sealant to California Manufacturers13 Years Factory SV-999 Structural Glazing Silicone Sealant to California Manufacturers
  • 13 Years Factory SV-999 Structural Glazing Silicone Sealant to California Manufacturers13 Years Factory SV-999 Structural Glazing Silicone Sealant to California Manufacturers
  • 13 Years Factory SV-999 Structural Glazing Silicone Sealant to California Manufacturers13 Years Factory SV-999 Structural Glazing Silicone Sealant to California Manufacturers

Short Description:

Description SV – 999 silicone structural sealant is a one-component, neutral curing, designed for glass curtain wall, aluminum curtain wall, glass daylighting roof and metal structural engineering structural assembly silicone sealant. Show the effective physical properties and bonding performance   Key Features 1. 100% silicone 2. No sag 3. Strong bonding strength 4. Water & weatherproof 5. Primerless adhesion to most building materials 6. 25% movement capability   Basic Application...


Product Detail

Attentions

Application

Product Tags

Quality First,and Customer Supreme is our guideline to provide the best service to our customers.Nowadays, we are trying our best to become one of the best exporters in our field to meet customers more need for 13 Years Factory SV-999 Structural Glazing Silicone Sealant to California Manufacturers, We welcome new and old customers from all walks of life to contact us for future business relationships and achieving mutual success!


Description

SV – 999 silicone structural sealant is a one-component, neutral curing, designed for glass curtain wall, aluminum curtain wall, glass daylighting roof and metal structural engineering structural assembly silicone sealant. Show the effective physical properties and bonding performance

 

Key Features

1. 100% silicone

2. No sag

3. Strong bonding strength

4. Water & weatherproof

5. Primerless adhesion to most building materials

6. 25% movement capability

 

Basic Application

1.Glass curtain wall, aluminum curtain wall structure adhesive seal

2.Glass daylighting roof, metal structure engineering

3.Insulating glass bonding

 

Technical data sheet

Test standard Test project Unit value
Before curing——25℃,50%R.H.
  specific gravity g/ml 1.40
GB13477 Flow, sagging   or vertical flow mm 0
GB13477 Operating time min 15
GB13477 surface drying time(25℃,50%R.H.) min 40-60
Sealant curing speed and operating time   will have different with different temperatures and temperature, high   temperature and high humidity can make sealant curing speed faster, rather   low temperature and low humidity are slower.21 days after   curing——25℃,50%R.H.
GB13477 Durometer Hardness Shore A 40
  The ultimate   tensile strength Mpa 1.3
GB13477 Tensile strength(23℃) Mpa 0.8
GB13477 Tensile strength(90℃) Mpa 0.5
GB13477 Tensile strength(-30℃) Mpa 0.9
GB13477 Tensile strength(flooding) Mpa 0.6
GB13477 Tensile strength(flooding   – ultraviolet) Mpa 0.6

 

Certification

GB 16776;ASTM C1184

 

Color

Black

 

Package

300ml in cartridge * 24 per box, 500ml in sausage *20 per box

 

Shelf life

12 months

 

Note

If you want the TDS or MSDS or other details, please contact with our sales person.

 

  • Previous:
  • Next:



  • Terry talks about Tyvek which is a rain shield that protects the house from moisture. When water goes through a homes siding, it hypothetically hits this barrier and runs down to the ground. Terry further notes that the rain shield does not provide air sealing; instead, all the air sealing is already taking place behind the Tyvek in the polyisocyanurate foam, OSB, and behind the OSB where the spray foam has been applied.

    Furring strips are put over the Tyvek, so that when siding is placed over it, there is an air space between the siding and rain shield. In other words, air can circulate beneath the siding to dry it out if it gets too wet thus avoiding a possibility of deterioration. The window trim is then put up on top of the furring strips. A bug screen is then applied on top and bottom of the furring strips and Tyvek. The siding, fiber cement Hardie board, is finally put on. The practice of putting on furring strips on top of the rain shield is different from traditional building where this step is skipped; instead, the siding is put right on top of the rain shield.

    Related Products

    WhatsApp Online Chat !